Everett has 78 active development records - building permits, land-use applications and environmental reviews - of which 5 are under review and 1 are open for public comment.
The most significant open items are Everett Outdoor Multipurpose Facility; 106th Everett Storage; Rowan Park.
From Everett’s official records (www.everettwa.gov); updated Sep 4, 2026. Nothing here is estimated.
Everett Outdoor Multipurpose Facility (City of Everett) — Environmental review under way. The City of Everett proposes to develop and operate a new or updated outdoor multipurpose facility that will host baseball and non…
Under review for 22 months — longer than every one of the 13 applications in Everett decided in the last few years.
106th Everett Storage (City of Everett) — Environmental review complete (Feb 2025). PROJECT DESCRIPTION: The project proposes 5 storage buildings which total 25 units. A private drive connected to 106th St SW will serve …
Rowan Park (City of Everett) — Open for comment until Sep 10. Applications have been submitted for environmental review and preliminary approval of Rowan Park, a 248-unit lot subdivision and associated site improvements …
City of Everett Comprehensive Plan (City of Everett) — Environmental review under way. Everett will adopt an updated comprehensive plan and development regulations consistent with state law and regional plans and policie…
Under review for 16 months — longer than every one of the 13 applications in Everett decided in the last few years.
106th Everett Storage (City of Everett) — SEPA determination issued. The project proposes 5 storage buildings which total 25 units. A private drive connected to 106th St SW will serve the storage units from the south end…
Tara Luckie (City of Everett) — Environmental review complete (Sep 2024). Construction of 4 ADA parking spaces, emergency fire turn-around, and 96 additional parking spaces to support a proposed commercial wedding facili…
PetroCard Everett UST removal and remedial excavation (City of Everett) — SEPA determination issued. Decommissioning and removal of two (2) 5,000-gallon capacity gasoline underground storage tanks and one (1) 12,000-gal…
Steele View (City of Everett) — SEPA determination issued. Development will include a total of 28 single-family dwelling (SFD) lots and three tracts on an 8.37-acre site, comprised of three existing lots. One of the prop…
SEPA - Fred Meyer #095 Fuel Station UST Removal (City of Everett) — SEPA determination issued. The proposal includes the demolition of the existing Fred Meyer fuel station located at 8530 Evergreen Way, Everett, WA. Work…
Achilles Silo Replacement 2026 (City of Everett) — SEPA determination issued. Removal of two existing 40,000 gallon silos (storage tanks) and installation of two new 37,000 gallon silos. Location: 1407 80th St SW, Everet…
Lane Everett (City of Everett) — Environmental review complete (Jan 2025). Proposal for a 119-stall parking lot for additional vehicle storage and sales for the Dwayne Lane vehicle sales. Work includes filling and gradi…
PGSF and WMVD Conveyance Improvements (City of Everett) — SEPA determination issued. PROJECT DESCRIPTION: Construction of the Port Gardner Storage Facility (PGSF) and the West Marine View Drive area (WMVD) conveyance imp…
GO STORE IT STORAGE (City of Everett) — SEPA determination issued. SEPA and Administrative Use applications have been submitted to construct a 155,600 square-foot, four (4) story, fully enclosed self-storage building wit…
Achilles Silo Replacement 2026 (City of Everett) — SEPA determination issued. Removal of two existing 40,000-gallon silos (storage tanks) and installation of two new, 37,000-gallon silos on a 19-acre site developed with…
Madison Elementary School Replacement (City of Everett) — SEPA determination issued. The Everett School District (District) is proposing to replace Madison Elementary School. The replacement school will be constructed s…
SEPA - Fred Meyer #095 Fuel Station UST Removal (City of Everett) — SEPA determination issued. The proposal includes the demolition of the existing Fred Meyer fuel station located at 8530 Evergreen Way, Everett, WA. Work…
PetroCard Underground Storage Tank Removal and Remediation (City of Everett) — SEPA determination issued. The project includes the decommissioning and removal of two (2) 5,000-gallon capacity gasoline underground storage…
PGSF and WMVD Conveyance Improvements (City of Everett) — SEPA determination issued. The project includes the construction and operation of the Port Gardner Storage Facility (PGSF) and the West Marine View Drive (WMVD) C…
Lyons Site Clean Up (City of Everett) — Environmental review complete (Nov 2024). The proposal is to remove crush gravel fill that was imported/placed on the site between 2018 and 2019. The removal will include the 950 l…
Waits Rezone (City of Everett) — Environmental review complete (Sep 2024). An application has been submitted by the City of Everett to rezone 0.55 acres from R-2 (Single Family Detached Medium Density) Zoning to NB (Neig…
Lane Everett (City of Everett) — Environmental review complete (Feb 2025). The proposed project is for the construction of a 119-stall parking lot to be used for additional vehicle storage and sales for the Dwayne Lane v…
N Broadway Go-Store-It (City of Everett) — SEPA determination issued. The applicants have proposed the construction of a four (4) story, 155,600 square-foot, fully enclosed self-storage facility with commercial lease spa…
Glenwood Relocation - Wireless Telecommunications Facility (City of Everett) — SEPA determination issued. Verizon Wireless proposes to install antennas, and associated equipment on a new 150’ tall stealth monofir tower c…
Riverfront II (City of Everett) — SEPA determination issued. A SEPA application has been submitted to address cleanup and remediation of contaminated soils at the project site. Scope of project will include methane mitig…
Dagmar SEPA Dredge (City of Everett) — SEPA determination issued. The lanes of the marina launch have silted in to the point where the lanes have become obstructed. Approximately 1,845 cubic yards of material will be rem…
Tomorrow's Hope Child Development Center (City of Everett) — SEPA determination issued. PROJECT DESCRIPTION: A Conditional Use Permit and SEPA application have been submitted to construct a new, one-story, approximately …
Riverfront II (City of Everett) — SEPA determination issued. PROJECT DESCRIPTION: A SEPA application has been submitted to address cleanup and remediation of contaminated soils at the project site. Scope of project will …
Dagmar Dredge (City of Everett) — Environmental review complete (Feb 2025). PROJECT DESCRIPTION: The marina launch lanes have silted in. Approximately 1,845 cubic yards of material will be dredged from an area of +/- 15,…
Everett Gospel Mission Expansion (City of Everett) — SEPA determination issued. SEPA and Administrative Use applications have been submitted by the Everett Gospel Mission to address the existing outdoor emergency shelter…
Snohomish Conservation District (City of Everett) — SEPA determination issued. Proposed two-story, 13,200 square-foot office building, including related site development, parking, and landscaping. Location: 3202 91st St …
Seaport Modernization Pier 3 Electrification (City of Everett) — SEPA determination issued. The Port of Everett will be improving electrical capacity to its Pier 3 facility at Hewitt Terminal, located within its strategi…
Tomorrow's Hope Child Development Center (City of Everett) — SEPA determination issued. A Conditional Use Permit and SEPA application have been submitted to construct a new, one-story, approximately 26,700 square foot,…
Qualitel Bev Ed Business Park (City of Everett) — Environmental review complete (Feb 2025). final plan approval for 2 lots within business park zone and amendment to a recorded binding site plan Location: 2822 119th St S…
City of Everett Joint Training Facility (City of Everett) — Environmental review complete (Oct 2024). The City of Everett Fire Department proposes to build a firefighting training center at 2100 W Marine View Drive. The …
HOLG - AP - 03741 (City of Everett) — SEPA determination issued. Underground storage tank removal, excavation, and replacement with electric heat. Project scope may also include soil sampling and remediation of suspected…
2024 Comprehensive Sewer Plan (City of Everett) — Environmental review complete (Feb 2025). Sewer Plan Location: 3200 Cedar St, Everett, WA 98201. Application date: February 21, 2025. City contact: Alex Byrd, abyrd@evere…
Everett 2044 Comprehensive Plan and Development Regulation Periodic Update (City of Everett) — Environmental review under way. Periodic update of the city's comprehensive plan and development regulations under the growth…
Under review for 15 months — longer than every one of the 13 applications in Everett decided in the last few years.
Everett land divisions procedures and development standards update (City of Everett) — SEPA determination issued. The proposal would update the City of Everett land divisions procedures and development standards to imple…
Everett 2044 Housekeeping Ordinance (City of Everett) — Environmental review under way. The proposal corrects errors and clarifies provisions in the development regulation amendments adopted as part of the Everett 2044 C…
Under review for 7 months — longer than every one of the 13 applications in Everett decided in the last few years.
Everett Critical Area Regulations Periodic Update (City of Everett) — SEPA determination issued. The proposal would update the City of Everett critical area regulations to address items identified in the recently-adopted…
Achilles Silo Replacement 2026 (City of Everett) — SEPA determination issued. Removal of two existing 40,000-gallon silos (storage tanks) and installation of two new, 37,000-gallon silos on a 19-acre site developed with…
Snohomish Conservation District (City of Everett) — SEPA determination issued. Proposed two-story, 13,200 square-foot office building, including related site development, parking, and landscaping. Location: 3202 91st St …
Cast Iron Main Replacement - Phase 2 (City of Everett) — SEPA determination issued. This project consists of approximately 5,600 LF of 8-inch and 12-inch diameter water main replacement and associated appurtenances such …
Riverfront II (City of Everett) — SEPA determination issued. PROJECT DESCRIPTION: A SEPA application has been submitted to address cleanup and remediation of contaminated soils at the project site. Scope of project will …
Tara Luckie (City of Everett) — Environmental review complete (Sep 2024). Construction of 4 ADA parking spaces, emergency fire turn-around, and 96 additional parking spaces to support a proposed commercial wedding facili…
SEPA - Fred Meyer #095 Fuel Station UST Removal (City of Everett) — SEPA determination issued. The proposal includes the demolition of the existing Fred Meyer fuel station located at 8530 Evergreen Way, Everett, WA. Work…
Solie Funeral Home human crematory (City of Everett) — SEPA determination issued. To install one Natural Gas fueled Facultatieve Technologies Model (FT) FT III Human Crematory rated for 200 lbs/hr. Location: 3301 Colby A…
SEPA - Fred Meyer #095 Fuel Station UST Removal (City of Everett) — SEPA determination issued. The proposal includes the demolition of the existing Fred Meyer fuel station located at 8530 Evergreen Way, Everett, WA. Work…
Everett land divisions procedures and development standards update (City of Everett) — SEPA determination issued. The proposal would update the City of Everett land divisions procedures and development standards to imple…
Achilles Silo Replacement 2026 (City of Everett) — SEPA determination issued. Removal of two existing 40,000 gallon silos (storage tanks) and installation of two new 37,000 gallon silos. Location: 1407 80th St SW, Everet…
FA Program - AP - 03675 (City of Everett) — SEPA determination issued. Collect soil samples to determine nature and extent of contamination from 1991 leak. Project scope may also include remediation of suspected constitu…
Everett Gospel Mission Expansion (City of Everett) — SEPA determination issued. SEPA and Administrative Use applications have been submitted by the Everett Gospel Mission to address the existing outdoor emergency shelter…
Rowan Park (City of Everett) — Open for comment until Sep 10. Applications have been submitted for environmental review and preliminary approval of Rowan Park, a 248-unit lot subdivision and associated site improvements …
Everett Manufactured Housing Communities Zone (City of Everett) — SEPA determination issued. The City of Everett is rezoning seven of the city’s ten manufactured home communities to restrict redevelopment of change of us…
Outfall 012 Stormwater Treatment Improvements (City of Everett) — SEPA determination issued. The proposal involves replacing approximately 200 lineal feet (LF) of 15-inch diameter stormwater conveyance pipe with 18-inch …
Spencer Island Ecosystem Restoration Project – Puget Sound and Adjacent Waters (City of Everett) — SEPA determination issued. Interested parties are hereby notified that the U.S. Army Corps of Engineers, Seattle District…
Cast Iron Main Replacement - Phase 1 (City of Everett) — SEPA determination issued. This project consists of approximately 2,700 LF of 8-inch diameter water main replacement and associated appurtenances such as fire hydr…
PetroCard Underground Storage Tank Removal and Remediation (City of Everett) — SEPA determination issued. The project includes the decommissioning and removal of two (2) 5,000-gallon capacity gasoline underground storage…
PetroCard Everett UST removal and remedial excavation (City of Everett) — SEPA determination issued. Decommissioning and removal of two (2) 5,000-gallon capacity gasoline underground storage tanks and one (1) 12,000-gal…
Outfalls 006 and 007 Stormwater Treatment Improvements (City of Everett) — SEPA determination issued. The Port of Everett will be making improvements to the stormwater conveyance and treatment system at its International…
The largest open records right now: Everett Outdoor Multipurpose Facility; 106th Everett Storage; Rowan Park; City of Everett Comprehensive Plan; 106th Everett Storage.
Every record on this page links to the city's or county's own permit listing. AreaMatter reads the official permit and land-use feeds every 12 hours and shows each record's status, dates and location; residents can also enter an address to see what is near it.
Under review: the city is still deciding. Open for comment: there is a deadline to be heard. Approved / issued: the permit or decision has been granted. Under construction and completed follow the city's own record.