City of Jackson Water Tank Replacement Project (City of Jackson) - Open for comment until Oct 1. The Project proposes to replace the Martell water storage reservoir (Martell Reservoir/Clearwell). The 1.3-million-gallon Martell Reservoir/Clearwell was built in the 1970s and is antiquated infrastructure that no longer meets current design standards and is in a state of disrepair. The reservoir will be replaced with two (1.3 million gallon) water storage tanks and new inlet and outlet piping will be installed to and from the new tanks and connect to existing fill and distribution pipes. All eq… Location: Kennedy Mine Road, Jackson, CA 95642. Application date: September 2, 2026. Lead agency: Jackson, City of. Comments are due by October 1, 2026.
Facts from the official record only; AreaMatter does not predict outcomes, values or traffic.
Only verified residents are counted, at most a few per household. Shared only as aggregates with your neighbors and, later, with the city. Never with your name.
Comments due Oct 1, 2026 Deadline Sep 30, 2026, 5:00 PM.
| Address | Kennedy Mine Road, Jackson, CA 95642 |
| Comment Deadline | Sep 30, 2026, 5:00 PM |
| Lead Agency | Jackson, City of |
| Location Precision | site |
| Project Number | 2026090154 |
Tracked by AreaMatter since Sep 5, 2026. Dates above come from the city's own records; “observed” entries are changes we detected between checks.
This summary restates facts from the official source; it does not evaluate the proposal or recommend a position.